How the calculation works

  • Capacity = 60 × screw cross-section × pitch × speed × filling degree × inclination factor, in m³/h.
  • Cross-section = π/4 × (D² − d²). For a shafted screw the calculator assumes a shaft of 0.3 × D; a shaftless spiral uses the full trough cross-section.
  • Inclination factor: the capacity falls by about 2 % for every degree of inclination.
  • Mass flow = capacity × bulk density.

Typical values for wastewater plants

MaterialBulk densityFilling degreeUsual screw
Screenings700–900 kg/m³20–30 %Shaftless spiral
Dewatered sludge cake900–1,100 kg/m³25–40 %Shaftless spiral
Grit1,400–1,700 kg/m³15–30 %Shafted or shaftless, wear-resistant
Dry bulk solids such as lime500–1,000 kg/m³30–45 %Shafted screw

Limits of this calculator

The filling degree and the permitted speed depend on how the material behaves: sticky, fibrous and abrasive materials need lower values. The calculator does not check the drive power or the torque. Our screw and belt conveyors are sized for the material, the conveying length and the inclination of your plant.

Frequently asked questions

How is the capacity of a screw conveyor calculated?

Multiply the free cross-section of the screw by the pitch and the speed, then by the filling degree and a factor for the inclination. The result is the volume conveyed per hour.

When is a shaftless screw conveyor used?

For sticky, fibrous or lumpy materials such as screenings and dewatered sludge. Without a centre shaft there is nothing the material can wrap around or block.

How fast should a screw conveyor run?

Shaftless spirals for screenings and sludge usually run at 10–30 rpm to limit wear on the liner. Shafted screws for free-flowing bulk solids run faster, typically 30–80 rpm.